Loading...

PIPING SYSTEM(BWTS)

    Our scope Includes Piping operations at the shipyard involve the installation, maintenance, and repair of piping systems that are crucial for various shipbuilding and maintenance processes.
  • GRE Line
  • Cargo System
  • Bilge and Ballast
  • Fuel and Oil System
  • Fire Supression System
  • Cooling and Heating System
  • Oil-Water Separation system
  • Exhaust Gas Cleaning System
  • Sewage and Water Treatment System
  • Once installed, the pipes are subjected to pressure testing and non-destructive examination to verify their structural soundness.
  • Rigorous quality control measures are implemented throughout the process to guarantee the integrity and reliability of the piping systems.
  • Properly executed piping operations are essential for the safety, performance, and durability of the vessels being constructed or repaired at the shipyard.
  • The successful execution of piping operations is crucial for the overall performance and longevity of a ship, making it a vital component of the shipbuilding process.
  • Our operations at a shipyard are a complex and critical aspect of shipbuilding, involving the installation and integration of various piping systems throughout the vessel.

img piping

STRUCTURAL SYSTEM

  • Rudder system
  • Mast and Crane
  • Keel and Stern
  • Propulsion system
  • Frame and Stiffener
  • Ballast and Stability
  • Tanker and Cargo Hold
  • Deck and Super structure
  • Our operations at a shipyard are the backbone of shipbuilding, involving the construction and assembly of the ship's skeleton.
  • The successful execution of structural operations is paramount in creating a robust and durable ship capable of withstanding the rigors of the marine environment.
  • As the structure takes shape, skilled workers meticulously align and secure each component, ensuring the vessel's strength and integrity. Rigorous inspections are conducted throughout the process to identify and rectify any defects, guaranteeing the vessel's compliance with safety and regulatory requirements.
  • ABU SADAM process begins with the fabrication of steel or aluminum plates, which are cut, shaped, and welded together to form structural components like bulkheads, decks, and frames. These components are then meticulously assembled in a precise sequence, adhering to strict engineering standards and quality control measures.

Image 2
Icon